Infrastructure facilities of Dr. Abidi’s pharmaceutical company

Project Specifications

The Employer

Dr. Abidi Pharmaceutical Company

Project Consultant

Abad Pey Paydar

Project Location

Tehran, Iran

Timing

From February 2021 to April 2021

Project Process Percentage

100%
100%

Project Introduction

The project of providing services related to the design of executive plans (second stage) of the mechanical infrastructure facilities of Dr. Abidi’s site was carried out by Abad Pey Paydar as the designer and Dr. Abidi’s pharmaceutical company located in Tehran as the employer. This project included the design of a green space irrigation network, industrial and sanitary wastewater collection network, and firewater network. Also, our team should prepare for the costs of the mentioned networks.

Green irrigation network

The goal of Dr. Abidi Pharmaceutical Company’s green space irrigation project was to develop an efficient irrigation system to support green spaces.

The design process included a detailed analysis of the specific needs of green spaces. Our team considered factors such as plant types, soil conditions, water availability, and weather considerations. These considerations are necessary to ensure the development of an irrigation network that distributes water optimally. We also paid attention to the growth and health of the green space in the region.

We integrated water conservation and sustainability considerations into the design. Abad Pey also wanted to ensure the efficient use of water through the implementation of smart irrigation practices and technologies. This work aimed to minimize water losses, reduce environmental impacts, and promote responsible management of water resources.

Sewer network

Firstly, our team divided the process of designing the sewage network of Dr. Abidi’s pharmacy site into two parts. These two are industrial wastewater and sanitary wastewater. For each of them, we prepared and delivered the pipeline plan, profile, and implementation details along the map.

Secondly, the design of the wastewater collection network was focused on the design and construction of the network including pipelines, manholes, and related infrastructure. Additionally, this specification emphasized the need for an efficient and reliable network to collect and transfer wastewater from Abidi Pharmaceutical Company.

Conclusion

In conclusion, this project is an example of Abad Pey Paydar’s commitment to providing efficient and environmentally friendly designs. The successful implementation of this project will support the growth of Abidi Pharmaceuticals by guaranteeing the management of the irrigation network, sewage collection network, and firewater network.

Water supply to Nasim Aras company
Concrete channel construction of Behran Oil Company