Project Introduction

The project of implementing the water supply pipeline to the Chemical Research factory was carried out by Abad Pey Paydar as a contractor, consultant, and equipment supplier, and research chemistry located at the site of Aras Heavy Industries as the employer. This project included the installation of a water supply pipeline. The mentioned pipeline connected the main pipe located in the 35-meter middle street of the site to the factory.

Construction

The implementation stage included various activities; including site preparation, mapping the route from the branching point from the 35-meter street to the entrance of the factory, the implementation of polyethylene pipes with a diameter of 200 with a working pressure of 10 bar, the implementation of the drainage basin and related connections, the installation of all polyethylene and valves, asphalt cutting and implementation sleeve. We also considered factors such as pipeline material selection, diameter size, and hydraulic considerations to ensure an efficient and reliable water supply system.

Completing the water supply pipeline to these factories in the Aras Free Zone is a vital resource for their activities. It also guarantees a reliable and uninterrupted water supply. This is essential for various industrial processes, cooling systems, and other water-related needs.

Supervision

Abad Pey Paydar was also responsible for supervising the implementation of this water supply project. This responsibility includes compliance with industry standards and coordination with Aras Chemical Research employers. We provided expert solutions in pipeline installation techniques, quality control measures, and project management and ensured the successful implementation of the water supply pipeline.

Conclusion

In conclusion, the implementation of the water supply pipeline to the research chemical factory shows the commitment of Abad Pey Paydar as a contractor and consultant in providing necessary infrastructure solutions. This project supports the smooth functioning of factories. It also helps the growth and success of Aras heavy industries. In addition, a reliable water supply increases efficiency and ensures continuous production and sustainability of factories.